Documents
Here you can find the published documents of the REPOSIT project.
Workpackage 1
- D1.1 -"Project Management Plan"
- Followed workplan along REPOSIT project.
- D1.2 -"Final Report"
- End conclusions of REPOSIT project.
Workpackage 2
- D2.1 -"State-of-the-art of current Collision Avoidance Systems"
- Revision of current technologies used for collision detection and check for gaps for REPOSIT system.
- D2.2 -"REPOSIT System Specifications and Requirements"
- Use cases and system specification including subdivision of the system in a top-down approach to a more detailed sub-system requirements definition.
Workpackage 3
- D3.1 -"REPOSIT System: Overall description of REPOSIT algorithm , Test Plan and Results"
- Practical view of D2.2 into a fixed set of requirements to be implemented in REPOSIT simulator. Includes the overall description of REPOSIT algorithm as well as modules synchronization. Also a test plan for the simulator is specified covering longitudinal and intersectional collision cases. Set of fixed results to be obtained from the simulator shall be also detailed for the analysis phase along WP4.
- D3.2 -"SOFTWARE: Relative GPS Algorithm"
- Detailed description of the Relative GNSS Module implemented within REPOSIT. Functions, Algorithms, data fluxes and interaction and synchronism with the rest of the modules.
- D3.3 -"SOFTWARE: Wireless V2V Communication System Simulator"
- Detailed description of the V2V Communication Module implemented within REPOSIT. Functions, Algorithms, data fluxes and interaction and synchronism with the rest of the modules.
- D3.4 -"SOFTWARE: REPOSIT CAS Algorithm"
- Detailed description of the CAS (Collision Avoidance System) Module implemented within REPOSIT. Functions, Algorithms, data fluxes and interaction and synchronism with the rest of the modules.
Workpackage 4
- D4.1 -"Simulation Scenarios and Test Cases"
- Detailed description of the Simulation variables and scenarios taken into account and logic of the Test cases.
- D4.2 -"Simulation Results Data Package. Evaluation of Simulation Results. Conclusions and Recommendations"
- Simulation results analysis.
Workpackage 5
- D5 -"REPOSIT In-vehicle integration feasibility analysis"
- In-vehicle analysis. Main issues and conclusions.
Workpackage 6
- D6.1 -"Certification and Standardisation Key Issues and Policy"
- Check-out for REPOSIT all Certification&Standardisation issues to take into account.
- D6.2 -"Certification and Standardisation Technical Results"
- Results obtained to D6.1 Key issues
Workpackage 7
- D7.1 -"REPOSIT Liaison and concertation plan with related activities. Dissemination Plan"
- Dissemination Plan.
- D7.2 -"REPOSIT Website"
- This Website.
- D7.3.1- REPOSIT Brochure
- D7.3.2- REPOSIT Poster IEEE
- D7.3.3- REPOSIT Presentation ITS-SPAIN (English Version)

- D7.3.4- REPOSIT Presentation ITS-SPAIN (Spanish Version)

- D7.3.5- Participation in ITS-Helsinki 2006-Room Sesion: Internet Connected Car

- D7.3.6- REPOSIT IEEE Demo Baltimore (USA)

- D7.3.7- REPOSIT IEEE Demo Baltimore (USA): Slides

- D7.3.8- REPOSIT article: "Projects Magazine" Oct2007

- D7.3.9- JPM CEN Interations (Commented by JPM)
- D7.3.10- ICT Results publication on REPOSIT Also available as PDF
. - D7.4 - Technological Implementation Plan





